Below are a selection of
recent services rendered to our clients. Should you require more information
on a particular type of service, please phone 020 8930 1684 or email
us
Lease & Dilapidation Advice
|
|
Muswell Hill, London:
The leasehold owner of a ground
floor office block required preliminary dilapidations advise
to evaluate the extent of their potential liability on a full
repairing lease. We undertook a detailed review of the lease
and licence documentation and a site inspection to evaluate
the extent of obligation required under the terms of the lease.
A report was provided to the client indicating the extent
of their liability and potential cost of claim. Advise on
the options available to meet their obligations.
|
|
|
South West, London:
We were instructed to act on behalf of a Head Tenant of a
1,250sq.m (13,500sq.ft) mixed office and warehouse unit to
provide preliminary advise on their repairing liability in
respect to their 25 year full repairing and insuring lease.
Subsequent instructions included preparation and service of
schedules of dilapidations on the sub-tenants. We undertook
a detailed review of the leases and licences to evaluate the
extent of disrepair under the lease terms.
|
|
|
Dury Way, London:
We act on behalf of the Landlord
to prepare and serve a schedule of dilapidation and claim
for damages on the leasehold tenant. We undertook a detailed
review of the lease and itemised repairing obligations for
each room and area demised. Subsequent negotiations and claim
settlement were undertaken by the Landlord.
|
License for Alteration
|
|
Bunhill Row, London:
Our client, a leasehold owner of the
five storey building, intended to undertake partition alterations
to make an open plan arrangement for staff offices. We undertook
site inspection, measurement, design evaluation and produced
detailed construction drawings for submission for statutory
consents. We undertook negotiations with the Landlord to obtain
an informal Landlord's Licence for Alteration on behalf of
the Client and secured a favourable position where our client
were not be required to reinstate the partitions upon expiry
of the lease, thus saving potential future cost liabilities.
|
Schedule of Condition
|
|
Rush Grove, London:
A prospective leaseholder intending
to take a 8 year lease of a warehouse required a schedule
of condition to attach to the lease to limit potential dilapidation
liability at the end of the lease term. We attended site and
produced a written and photographic schedule of condition.
|
|
|
Manor Court, Hamworth:
A prospective leaseholder intending
to take a 10 year lease of an office required a schedule of
condition to attach to the lease documentation in order to
limit any potential dilapidation liability at the end of the
lease term. We attended site and produced a written and photographic
schedule of condition.
|
Party Wall Advice
|
|
Station Road, Harrow: We
were appointed by three adjoining owners under the Party Wall
etc Act 1996 for a demolition of a 1900's church building
and a redevelopment of a modern church. We checked the validity
of information and intend design to ensure that the proposals
met statutory guidelines. Schedule of conditions and Party
Wall awards were agreed for the deep pile foundations proposed
and the raising of and alterations at the party walls.
|
|
|
Finchley Road, London:
Party Wall Notices were served upon
our appointing owner, an adjoining freehold investor. The
building owner intended works were to demolish a disused garage
area and develop a three storey (inc. basement) residential
accommodation in a confined area between the adjoining buildings.
We checked the validity of information and intend design to
ensure that the proposals met statutory guidelines. The project
is currently in progress.
|
|
|
Isleworth, Middx:
We were appointed by a firm of solicitors
to advise and provide an expert report on roof alterations
undertaken by the Client causing the roof eaves to project
beyond the previously existing condition. The adjoining owner
commenced proceeding against the overhanging intrusion. We
were asked to provide expert opinion as to whether the intrusion
caused an eventual loss to the adjoining owner and if so,
the cost for rectification. This case is currently in progress.
|
Building Pathology & Surveys
|
|
Tanning Shop, London:
We were requested to investigate various
different damp ingress issues in the unit. Site inspection
revealed that there was an obvious damp ingress to the ground
floor shop unit by the flooding in the upper unit. Additionally,
there was also water ingress from a rear flat roof roof that
has been newly installed but inadequately finished. There
was also water leaks from the 1st floor shower room where
mastic seals and joints had deteriorated.
|
|
|
Central Way, Feltham:
We were requested to investigate cracking
to the 1st floor slab to the office block. The floor was made
up of solid concrete precast slabs with screed and carpet
covering on top. Close inspection and evaluation revealed
that the large span floor slabs were found to be bowing. The
client was advised accordingly and recommendations were made
on the necessary further investigations and works necessary
to resolve the situation.
|
|
|
Ibis Hotel, Greenwich:
The hotel entrance steps had considerably
staining and there were concerns over the aesthetic nature
of the steps. Our inspection revealed that there was efflorescence
to the steps and due to the harsh chemical cleaning methods
employed the stone's protective layer was compromised resulting
in heaving staining attracted by foot traffic and natural
airborne dirt. We provide a detailed report on the evaluation
of the defects and advised on options for repair.
|
|
|
Grove Pub, London:
We were commissioned by a prospective
freehold purchaser of the public house to undertake a full
building survey of the building. A site inspection was undertaken
and all internal, external, basement and service areas were
inspected. The comprehensive 14 page building surveyors report
highlighted to the client the current condition of the building
including defects and the potential future significant risks
and costs associated with the building. Armed with the professional
report the client was better advised to make an informed decision
as to whether to proceed with the transaction or not.
|
|
|
Office,Central London:
We were asked by a client, a prospective
leasehold purchaser, to undertake a full building survey of
a 1st floor office unit contained within a larger office development.
A site inspection was undertaken of the complete building
development and a comprehensive 13 page building surveyors
report provided. The demise and the development was in a good
condition; the pertinent issues highlighted to the client
were the dilapidation and reinstatement conditions set within
the lease, clarification on the service charge provisions
and shared M&E services.
|
|
|
Office, Central London:
An expanding city based client required
a larger office accommodation and a full building survey was
required to safeguard their interests. The property forming
a row of terrace units was recently extensively refurbished
by the Landlord and the site inspection involved particularly
looking at potential inadequate design or works undertaken.
A comprehensive 15 page building survey report was provided
together with a schedule of condition that was later attached
to the lease to mitigate potential dilapidation issues arising
at the end of the lease.
|
Maintenance Advice
|
|
Various South East
- Retail Stores:
We undertook defects inspections, planned
maintenance reviews and fire risk assessments of 15 retail
stores in the south east of England. The surveys comprised
of various high street stores, industrial and non-industrial
retail stores and storage depots. Long term maintenance requirements
over a five year period were considered and costs determined.
|
Design & Contract Service
|
|
Various UK Wide Racecourses:
We were requested to formulate
designs and specifications for twelve UK wide racecourses
amounting to over £1,000,000 of work to meet the new
Disability Discrimination Act. The works included installation
of new disabled lifts, ramps, WC provisions, viewing platforms,
handrail modifications, door adaptations, car park provisions,
signage, induction loop installations, etc. We liaised with
managers and specialists to produce working methods for compliance
and considered practical management strategies. Following
tender returns, works were administered the contract works
at three racecourses with total works amounting to £180,000.
|
|
|
Uxbridge Road, Hatch End:
The freehold owner of the three storey
building intended to undertake conversion to refurbish and
upgrade the upper floors. Additionally, there was a requirement
to increase the lettable area by utilising the unused roof
void. We undertook site inspection, design evaluation and
produced detailed drawings for submission for statutory planning
consents. The project is currently in progress and our services
will include production of full building regulation drawings
and monitoring the refurbishment process through to completion.
|
CDM Regulations
|
|
Whitterington Road, London:
A developer undertaking property
conversions into flats required, as part of the Construction
(Design and Management) Regulations 1994, a Planning Supervisor
to administer the requirements of the regulations. We provided
this service and formulated a Pre-construction health &
safety plan and reviewed the contractor's health & safety
plan to ensure risk assessments and safety issues have been
considered and addressed prior to the works. We worked closely
with the client, designer, contractor and project team to
ensure various obligations and requirements of the regulations
were met at each stage of the project.
|
|
|
Thayer St, London:
A client undertook refurbishment
works of the five storey building including internal alteration,
new stair, external repairs and roof works. We were appointed
as Planning Supervisor to administer the requirements of the
CDM regulations. A Pre-construction health & safety plan
was formulated and the contractor's health & safety plan
was reviewed.
|
Alteration & Fitting Out
|
|
Warehouse, Greenford:
A division of a Europe wide entertainment
lighting company required various alterations, subdivisions
and mezzanine floor installations to be undertaken to the
4,500sq.m (48,500sq.ft) warehouse facility. We provide initial
design assistance and considered implication on statutory
building and fire regulations. The works were tendered and
an evaluation of the tenders was reported to the client. This
project is currently in progress.
|
Insurance Valuations
|
|
North Gate Street, Gloucester:
Our client, a nationwide property management
company, required a valuation of the rebuilding cost for insurance
purpose. Having undertaken a site inspection, we reviewed
current valuation data to evaluate the insurance valuation
for the building. A report was provided to the client for
forwarding onto their insurance company. The rebuilding construction
cost was evaluated to over £1,500,000.
|
Fire and Health & Safety Risk Assessments
|
|
Various, National:
Our various UK wide clients
have commissioned us to
evaluate risks associated with their portfolio of buildings.
This entailed a review of the means of escape for emergency
and fire, tripping hazards, accessibility (inc disability),
etc. The 20 page report provided the client with an overview
of the risks and the possible solutions to reduce or eliminate
the risks.
|
|
|
Various, London:
Some individual clients
have specifically requested advice on fire safety in order
to meet their statutory duties as buildings owners or employers.
We attended site, undertaken
a FIRE RISK ASSESSMENT and evaluated risks associated with
fire escape routes, smoke detection, fire notices & signage,
fire compartmentation, management procedures and training,
etc. The 15 page report provided the clients with a schedule
of risks to be addressed and solutions.
|
Disability Discrimination Act Audits
|
|
Various UK Racecourses:
The Disability Discrimination
Act, requires that service providers must adapt their buildings
and services so as not to discriminate against disabled persons.
We undertook reviews of disability audits for twelve racecourses
in England and formulated specifications for the works. Considerations
included provisions for new disabled lifts, ramps, WCs, viewing
platforms, handrail modifications, door adaptations, car park
provisions, signage, induction loop, etc. We liaised with
managers and specialists to produce working methods for compliance
and considered practical management strategies.
|
|
|
Office, London:
The Disability Discrimination
Act, requires that where a disabled person is employed,
reasonable adjustments must be made to the buildings so
as not to discriminate against them. We initially met with
the disabled employee who had Multiple Sclerosis and considerable
difficulty in accessing the entrance steps and circulation
areas. Additionally, there were no WC facilities that can
be used with the wheel chair. We then undertook an assessment
of the building facilities and services (including emergency
evacuation procedures) and advised our client on essential
ramp, WC provisions and facilities that are necessary for
compliance.
|